City of Mount Dora Eastern Service Area Water Treatment Plant

Posted on May 13th, 2015

BESH has completed the Eastern Service Area Water Treatment Plant for the City of Mount Dora. The scope of the project included surveying, final design, preparation of construction plans, permitting and construction management for a new 4.00 mgd water treatment plant with an ultimate capacity of 7.00 mgd. In addition, the project included the design, permitting and construction management services for approximately 3 miles of 16″ capital water line to serve the areas surrounding the […]

Read more »

City of Clermont Lift Station E4 Replacement

Posted on May 13th, 2015

      BESH recently completed the Lift Station #E4 Replacement project for the City of Clermont. The City of Clermont replaced the existing Lift Station No. E4, and constructed a new lift station on the same site. The new station re-used the existing pumps and VFD’s and added a third jockey pump with VFD. Design included a new wet well, valve vault, and electrical panel/controls. The existing generator was reconnected to the new station, and […]

Read more »

Lake County Roundabout @ CR561 and CR455

Posted on May 13th, 2015

    BESH is pleased to report that progress is being made on the Lake County Roundabout project located at the intersection of CR 561 and CR 455. BESH was contracted to provide survey, design, utility coordination and permitting for the Roundabout Design, in Lake County. This is an FDOT LAP funded project. This project modified an existing 4-way intersection that consisted of four ramps and a typical tee crossing and replaced it with a large […]