City of Clermont Downtown Streetscape Phase I

Aerial of Osceola Street between 7th and 8th Street

This project is part of the City of Clermont’s Downtown Master Plan which focuses on how to keep the growing City connected and protect its charms, while revitalizing the historic downtown section of the City with new gathering places for events along, and adjacent to, the waterfront. 

The purpose of the Streetscape Phase 1 project is to design an “event streets” roadway for Osceola and improve parking and walkability along West Ave.  The project includes adjustments to the stormwater collection system, potable water and sanitary sewer in addition to new landscaping, hardscapes, electrical event power and lighting.  Also included with Phase 1 was a portion of the Legacy Loop bike trail to improve cycling and walkability into the downtown district.  The complete Downtown Master Plan anticipates 3 phases to the Streetscape improvements. BESH’s scope of services includes Survey, Engineering Design, Project Coordination, Landscape Design, Electrical Design, Geotechnical Investigation, and Construction Management Services.