Home » Portfolio » Municipal Projects » Facilities » Tavares Pavilion on the Lake

Tavares Pavilion on the Lake

The BESH Team partnered with Blaise, Fiebach & Associates to create a one-of-a-kind wedding and conference facility over the waters of Lake Dora, adjacent to Wooton Park in the City of Tavares, Florida. The two-story structure is accessed via a 40′ wide pier capable of holding outdoor events such as art and car shows, and features an integrated floating marina for water
taxi and seaplane mooring. The facility is destined to become the premier wedding and conference facility in Central Florida, offering a unique experience to brides-to-be, and allowing for aerial departures from their nuptials via seaplane.

Estimated Construction Cost: $4,500,000.00 (estimated)
Project is Ongoing

Client Contact: John Drury, City Administrator

Phone: (352)742-6209

PROJECT TEAM

BESH – Prime Consultant
Robert A. Ern, Jr., P.E. – Engineer of Record
Troy Mitchell, P.E. – Project Engineer
Brad Bublitz – Project Engineer
Chris Williams – Senior Engineer

Blaise, Fiebach & Associates
Architect

DMC Marine Consultants
Marine Engineering Consultant