Grassy Lake Road & N. Grassy Lake Road Improvements

This project consists of 3.08 miles of roadway reconstruction in a area of 12 to 18 percent road grades. The design includes approximately 2 miles of four lane urban road section with sidewalks and bike trail, a mile of two lane rural roadway section through an area of limited right of way, and intersection improvements at US HWY 27. Design of this road included extreme cuts, fills and retaining walls to meet FDOT, Lake County, and Green Book standards. Included with this project was capital water and wastewater infrastructure for the City of Minneola to serve the future developments in the area. This project was undertaken by a private developer, as a requirement of development approval, on behalf of Lake County and the City of Minneola.

Construction Cost: $10,200,000.00
(estimated)

Design Completion Date: 2008
Construction: On Hold

Client: Leeds Holdings

Contact: Howard Lefkowitz
President

Email Address: howard@leedsholdings.com

Phone Number: (407) 667-8989


PROJECT TEAM

BESH – Prime Consultant
Duane K. Booth, P.E. – Project Manager & Engineer of Record
Brad Bublitz, E.I., Project Engineer
Mike Straughan, P.S.M., Project Surveyor
Travis Skinner, Survey Tech

ANDREYEV ENGINEERING, INC.
Geotechnical Investigation

LPG ENVIRONMENTAL
Environmental Consultant