North Sumter Utility Company

Water Treatment Plant #1, #2, and #3

The scope of work included final design, preparation of construction plans, permitting and construction management for three new water treatment plants with a combined capacity of 20.880 mgd. All subconsultants worked directly for Booth, Ern, Straughan & Hiott, Inc. The combined plants consisted of six, 12“ upper Floridan and two, 16” lower Floridan potable water wells pumping at 2,000 gpm each, a 500,000 gallon elevated storage tank, two ground storage tanks (2.5 MG total), forced draft aeration systems, VFD controlled high service pumping, pH adjustment systems, gas chlorination, backup power generation, I & C and SCADA, along with the related pump and electrical buildings.

Construction Cost: $9,200,000.00
Total, all plants

Completion Date: June 2011

Client Contact: Trey Arnett, Vice President
Central Sumter Utility Company

Client Phone Number: (352) 753-4747


PROJECT TEAM

BESH
Robert A. Ern, Jr. P.E. – Engineer of Record
Troy E. Mitchell, P.E.
Christopher B. Williams

BAILEY ENGINEERING CONSULTANTS, INC.
Electrical Design Subconsultant

SOUTHEAST STRUCTURAL ENGINEERS, INC.
Structural Design Subconsultant

ANDREYEV ENGINEERING, INC.
Geotechnical / Hydrogeologic Subconsultant

CHRISTOFF, KRIETEMEYER & ASSOC. P.A.
Architectural Subconsultant